Installation Procedures

Installation Procedures

 NOTE: Blowing directly into the closures is not recommended. Always ensure before entering the closures that any pressure is released via the external test valve in the base.

Preconnectorised XMJ

 english flag.png

 

Generic Joint Installation

 

pre-conn-cmj.png

 

Mechanical Gland for Preconnectorised Cables

 

Zip ties and more.jpg

 

 

Microduct Closures

micro2.jpg

 

Preco xMJ Video